20th January 2009

Images by Harris Digital Productions

The painters are now starting to decorate the iron balusters

The painters are now starting to decorate the iron balusters to the staircase

Masons are carrying out final works

Masons are carrying out final works to the stone joints at ground floor level at the base of the stairs

Two pieces of historic ironwork

Two pieces of historic ironwork. The circular piece is a grille which fits at the very top of the stairs and the curved piece fits over the void below the oval window.

The historic iron railings return to site

The historic iron railings return to site after being repaired and decorated by Eura Conservation.

The old iron gate

The old iron gate is carefully unloaded from a lorry upon its return to site

The metalwork specialists work with the stone masons

The metalwork specialists work with the stone masons to safely unload the historic ironwork as it returns to site