5th October 2007

Photos by Harris Digital Productions

The scaffolding is completed (ahead of schedule) and officially handed over to the main contractor - Cathedral Works Organisation. For the first time, we can obtain close-up images of the Monument and its golden orb.

Completed scaffolding
The scaffolding company, Allen and Foxworthy have erected 73,500ft of scaffolding tube, 24,500 scaffold fittings, 47,600 bolts tightened and 19,500 ft of scaffolding boards. Excavations and defrassing is carried out in the basement.

Egg and Dart
The 'egg and dart' under the viewing gallery

The orb
Lower section of the golden orb

The top of the orb
Top section of the golden orb, with Tower Bridge in the background.

Gary Phillips in the basement
Gary Phillips, defrassing (removing lose material) in the basement

Ian Foss, in the basement
Ian Foss, carrying out an excavation
in the basement